2001 | -Ecocera was established: Korea Institute of Ceramic Eng. & Tech. B.I, Gasan-dong, Geumcheon-gu, Seoul , Korea - Incorporated as Ecocera Co., Ltd. (contributed by Korea Institute of Ceramic Eng. & Tech.) - Achieved TBI research & development project: manufacturing cellular glass for cooling keeping LNG tanks and pipes sponsored by Ministry of Commerce, Industry and Energy |
2002 | - Set-up of cellular glass production factory Production (Capacity: 76,000㎡ )/ year for 51mm, in CHINA ) -Obtained venture firm certificate (cellular glass manufacturing technology) - Set-up of raw material factory production for cellular glass (Gyeonggi-do,KOREA) |
2003 | Achieved the research & development project (SMBA): corrosion-resistance cellular glass |
2004 | -Registration for patent (manufacture technology of cellular glasses) -Reconfirmation of being a venture business -Registration for patent (manufacture technology of crude glasses) |
2005 | Achieved the research & development project (Small & Medium Business Administration): Adhesive Bond for corrosion-resistance cellular glass |
2006 | - R&D center certificate (light weight material R&D center) No. 20062757 - Inno-biz business firm certificate |
2007 | - Achieved the research & development project (SMBA): Cellular glass absorbing electromagnetic waves |
2010 | - Relocate a Factory to Cheonan,KOREA |
2011 | -Relocated a Factory for PV Polysilicon to Gongju,KOREA |
| |||||||||||||||||||||||||
Work Period | Project Name | Chimney height and consumption | |
2003.8-2004.3 | Supplied stack lining materials to Korea Western Power Co., Ltd. Pyeongtaek thermal power plant (2 Stacks, #3-4) with Hyundai Construction Ltd. | 150m | 38mm9,184m2 (two stacks) |
2004.9-.2004.10 | Supplied stack lining materials to Korea Western Power Co., Ltd. Pyeongtaek thermal power plant (2 Stacks, #1-2) with Hyundai Construction Ltd. | 150m | |
2005.5 -2005.8 | Supplied stack lining materials to KDHC Dae-Gu District Heating Corporation | 120m,2,155 m2 /38mm | |
2005.6 -2005.9 | Supplied stack lining materials to KDHC Chung-ju District Heating Corporation | 120m, 1,424 m2/38mm | |
2006.7 -2006.8 | Supplied stack lining materials to Osan Energy District Heating Corporation | 80m, 1,220 m2 /38mm | |
2006.8 -2006.9 | Supplied stack lining materials to Banwol Energy District Heating Corporation | 100m, 2,950 m2 /38mm (three stacks) | |
2007.9 | Supplied stack lining materials to Cheonan (Corning special glass co., ltd.) | 65m,500 m2 /38mm | |
2011.9 | Supplied stack lining materials to Daejeon Power Plant | 80m, 700 m2 /38mm | |
Work Period | Project Name | Chimney height and consumption |
2006.7 -2007.1 | FGD Jeddah Plant Stage-4 stack lining for SWCC Power Plant Stack, Jeddah, SAUDI ARABIA (Contractor : Saudi Archirodon Ltd.) | 165m, 6,200sqm/51mm |
2006.12 | Pego Plant stack, PORTUGAL (Contractor : Chimney and Refractories International C.R.l.) | 490 sqm/38mm |
Jul.2008 | North America Power Plant | 3,500 sqm/51mm (two stacks) |
Aug.2009 | Marafiq Plant stack lining Power Plant Stack, Marafit, SAUDI ARABIA(Contractor C.R.l.) | 3,650sqm/38mm, |
Sep.2009 | Cebu Power Plant, Philippines(with Doosan) | 3,100sqm/51mm |
2010-2011 | Vuang Power Plant stack lining Power Plant Stack, VIETNAM (with C.R.l.) | 6,400sqm/51mm |
Nov.2012 | Shanghai Petrochemical Thermal Power Unit (with Zhenshen, CHINA) | 7,500sqm/38mm, 150m |
Apr. 2013 | Sinopec Yichang branch (with Zhenshen, CHINA) | 4,160sqm/38mm, 150m |
Jun.2013 | Metz, Australia | 500sqm/38mm |
May 2013 | Inner Mongolia HMHJ Aluminium Electricity Co.,Ltd. (With Zhenshen, CHINA) | 11,900sqm/38mm 200m |
Nov. 2013 | -Termotasajero 2 Coal Fired Power Plant Project, Colombia(Hyundai Eng.) | 1,200 sqm /38mm,120m |
2014-2015 | -Yanbu-3 Power Plant Chimney for SWCC, SAUDI ARABIA(Contractor RCC with Samsung Eng.) | 16,960sqm/38mm 200m |